Parkrose Middle School

About This Project

Carlson has participated in over 800 different school projects for over 63 different school districts in Oregon and Southwest Washington.

The building consists of eight pods containing three classrooms and one science classroom each. A new two story library is also contained within the new structure. A cafeteria with an open courtyard leads to the 16 acres of sport fields and track facilities.

Carlson worked directly for the Parkrose School District #3 and the other project team members included: General Contractor – Todd Construction; Architect – Dull Olson Weekes Architects; Structural Engineer – KpFF Consulting Engineers

Return to projects

Project Services

  • Structural Concrete
  • Structural Steel Framing
  • Structural Masonry
  • Proprietary Anchors
  • High Strength Bolting
  • Wood Framing
  • Cold-form Steel Framing
  • Structural Nailing
  • Moisture Testing
  • Soil Compaction
  • Rock Compaction
  • Asphalt compaction